The Zentrac Track runs from review to site support. You can start at any stage of the project.

How we work

The Zentrac Track.

Six stages, from review to site support. What we receive is checked; what we hand over is prepared for the next party.

  1. 01 Review

    We review the supplied drawings and site information and record gaps before modelling starts.

    Input
    Design drawings, specifications, site information
    Output
    Review notes and RFIs
  2. 02 Model

    We build discipline models to the agreed BEP and scope.

    Input
    Reviewed design, BEP, coordinates
    Output
    Discipline models
  3. 03 Coordinate

    We run clash checks in a federated model and track coordination issues.

    Input
    Discipline models, coordination rules
    Output
    Clash reports and issue register
  4. 04 Drawings

    We extract the agreed shop drawings from the coordinated model.

    Input
    Coordinated model, title blocks, drawing list
    Output
    Shop and combined services drawings
  5. 05 Quantities

    We prepare the agreed model-based quantities and schedules.

    Input
    Measurement rules, agreed model scope
    Output
    Quantity take-offs and schedules
  6. 06 Site Support

    We support site queries and model updates through to as-built handover.

    Input
    Site queries, verified site changes
    Output
    Updated and as-built models

Ways to work with us

Choose an engagement.

Join at the stage you need.

Schedules and turnaround are agreed for each scope.